Earned Value Management Limited
Other business support service activities not elsewhere classified
Contacts of Earned Value Management Limited: address, phone, fax, email, website, working hours
Address: 3rd Floor The Pinnacle 73 King Street M2 4NG Manchester
Phone: +44-1520 5000122 +44-1520 5000122
Fax: +44-1422 8525085 +44-1422 8525085
Email: n\a
Website: n\a
Schedule:
Is data incorrect or do we want to add more detail informations for "Earned Value Management Limited"? - Send email to us!
Registration data Earned Value Management Limited
Get full report from global database of The UK for Earned Value Management Limited
Addition activities kind of Earned Value Management Limited
23949904. Sails: made from purchased materials
33410200. Secondary precious metals
33540203. Tube, extruded or drawn, aluminum
47259901. Arrangement of travel tour packages, wholesale
50720100. Bolts, nuts, and screws
50820301. Concrete processing equipment
72170102. Upholstery cleaning on customer premises
87320201. Educational research
Owner, director, manager of Earned Value Management Limited
Director - Neil Francis Mcdowell. Address: House, Manchester Road, Altrincham, Cheshire, WA14 4RW, United Kingdom. DoB: December 1962, British
Jobs in Earned Value Management Limited, vacancies. Career and training on Earned Value Management Limited, practic
Now Earned Value Management Limited have no open offers. Look for open vacancies in other companies
-
Associate Director of Widening Participation (London)
Region: London
Company: King's College London
Department: Widening Participation Department
Salary: £49,722 to £57,674 Grade 8 p.a.
Hours: Full Time
Contract type: Permanent
Type / Role: Professional or Managerial
Categories: PR, Marketing, Sales and Communication,Senior Management
-
Women's Football 2nd Team Coach (Leicester)
Region: Leicester
Company: De Montfort University
Department: Strategic and International Partnerships
Salary: £26,495 to £32,548 Grade E p.a. pro rata per annum
Hours: Part Time
Contract type: Permanent
Type / Role: Professional or Managerial
Categories: Sport and Leisure
-
Emmanuel College Research Fellowships 2018 (Cambridge)
Region: Cambridge
Company: University of Cambridge
Department: Emmanuel College
Salary: £22,161 to £25,830
Hours: Full Time
Contract type: Fixed-Term/Contract
Type / Role: Academic or Research
Categories: Health and Medical,Medicine and Dentistry,Anatomy, Physiology and Pathology,Pharmacology, Toxicology and Pharmacy,Nutrition,Nursing,Medical Technology,Engineering and Technology,Civil Engineering,Mechanical Engineering,Aerospace Engineering,Electrical and Electronic Engineering,Production Engineering and Manufacturing,Chemical Engineering,Metallurgy and Minerals Technology,Maritime Technology,Biotechnology,Other Engineering,Information Management and Librarianship,Librarianship,Information Science,Curatorial Studies,Other Information Management and Librarianship,Historical and Philosophical Studies,History,History of Art,Archaeology,Philosophy,Theology and Religious Studies
-
Faculty Accountant (Part Time) (Bath)
Region: Bath
Company: University of Bath
Department: Finance & Procurement
Salary: £39,324 rising to £46,924 Pro Rata
Hours: Part Time
Contract type: Permanent
Type / Role: Professional or Managerial
Categories: Finance
-
Postdoctoral Scientist – Stem Cell Biology - Identifying Candidate Therapeutic Targets for Potential Drug Development (Manchester)
Region: Manchester
Company: The University of Manchester
Department: Cancer Research UK Manchester Institute
Salary: £30,000 to £39,800 dependent upon qualifications and experience
Hours: Full Time
Contract type: Fixed-Term/Contract
Type / Role: Academic or Research
Categories: Biological Sciences,Biology,Molecular Biology and Biophysics,Other Biological Sciences
-
Senior Scientific Policy Officer (Brussels - Belgium)
Region: Brussels - Belgium
Company: N\A
Department: N\A
Salary: €68,112 to €77,760
£62,424.65 to £71,267.04 converted salary*Hours: Full Time
Contract type: Fixed-Term/Contract
Type / Role: Professional or Managerial
Categories: Senior Management
-
Lecturer- Professional Construction (Blackpool)
Region: Blackpool
Company: Blackpool and The Fylde College
Department: N\A
Salary: £24,412 to £29,131 per annum
Hours: Full Time
Contract type: Permanent
Type / Role: Academic or Research
Categories: Architecture, Building and Planning,Architecture and Building
-
Research Associate in Mitigation Technologies (London)
Region: London
Company: Imperial College London
Department: Grantham Institute
Salary: £36,800 to £44,220 per annum
Hours: Full Time
Contract type: Fixed-Term/Contract
Type / Role: Academic or Research
Categories: Physical and Environmental Sciences,Other Physical Sciences,Engineering and Technology,Other Engineering,Economics
-
ACL in Cardiac Surgery (Leicester)
Region: Leicester
Company: University of Leicester
Department: Department of Cardiovascular Sciences
Salary: £31,931 to £55,288 per annum.
Hours: Full Time
Contract type: Fixed-Term/Contract
Type / Role: Academic or Research
Categories: Health and Medical,Anatomy, Physiology and Pathology
-
Post-doctoral Fellowships at the Science and Technology Facilities Council Laboratories in the UK (Didcot)
Region: Didcot
Company: STFC - The Science and Technology Facilities Council
Department: N\A
Salary: £30,056 to £41,572 per annum
Hours: Full Time
Contract type: Fixed-Term/Contract
Type / Role: Academic or Research
Categories: Biological Sciences,Biology,Physical and Environmental Sciences,Chemistry,Materials Science,Physics and Astronomy,Geology,Computer Science,Software Engineering,Engineering and Technology,Civil Engineering,Other Engineering
-
Funded PhD co-sponsored by The MTC: An exploration of Information and Communication Technologies for the Digital Revolution in Manufacturing (Loughborough)
Region: Loughborough
Company: Loughborough University
Department: N\A
Salary: N\A
Hours: Full Time
Contract type: N\A
Type / Role: PhD
Categories: Physical and Environmental Sciences,Physics and Astronomy,Mathematics and Statistics,Mathematics,Statistics,Computer Science,Computer Science,Software Engineering,Information Systems,Engineering and Technology,Mechanical Engineering,Electrical and Electronic Engineering,Production Engineering and Manufacturing
-
EngDStudentship: Finite Element Models Updating for Uncertainty Reduction in Offshore Wind Farms (Cranfield)
Region: Cranfield
Company: Renewable Energy Marine Structures
Department: N\A
Salary: N\A
Hours: Full Time
Contract type: N\A
Type / Role: PhD
Categories: Physical and Environmental Sciences,Materials Science,Engineering and Technology,Mechanical Engineering,Other Engineering
Responds for Earned Value Management Limited on Facebook, comments in social nerworks
Read more comments for Earned Value Management Limited. Leave a comment for Earned Value Management Limited. Profiles of Earned Value Management Limited on Facebook and Google+, LinkedIn, MySpaceLocation Earned Value Management Limited on Google maps
Other similar companies of The United Kingdom as Earned Value Management Limited: Ds Project Engineering Limited | Melissa Cook Limited | Ymr Uk Ltd | Nautilus Yachting Limited | Steiner Training Limited
Earned Value Management Limited is officially located at Manchester at 3rd Floor The Pinnacle. Anyone can search for the company by the postal code - M2 4NG. The enterprise has been in the field on the UK market for eight years. The enterprise is registered under the number 06676812 and their up-to-data status is liquidation. The enterprise is registered with SIC code 82990 and their NACE code stands for Other business support service activities not elsewhere classified. Earned Value Management Ltd released its latest accounts up until August 31, 2013. The firm's most recent annual return was released on August 19, 2014.
According to the official data, the following limited company is supervised by a single managing director: Neil Francis Mcdowell, who was given the job in 2008.
Earned Value Management Limited is a foreign company, located in Manchester, The United Kingdom. It is a limited by shares, British proprietary company. Since 1987, the company is headquartered in 3rd Floor The Pinnacle 73 King Street M2 4NG Manchester. Earned Value Management Limited was registered on 2008-08-19. We brings you a complete range of reports and documents featuring legal and financial data, facts, analysis and official information from Main Registry of The UK. Less 10 work in the company. Capital - 817,000 GBP, sales per year - approximately 885,000 GBP. Earned Value Management Limited is Private Limited Company.
The main activity of Earned Value Management Limited is Administrative and support service activities, including 8 other directions. Director of Earned Value Management Limited is Neil Francis Mcdowell, which was registered at House, Manchester Road, Altrincham, Cheshire, WA14 4RW, United Kingdom. Products made in Earned Value Management Limited were not found. This corporation was registered on 2008-08-19 and was issued with the Register number 06676812 in Manchester, The UK; now status company is n\a.
Its contact method and company information is as below. In total the company used 0 trading names. You can also view reviews of Earned Value Management Limited, open vacancies, location of Earned Value Management Limited on the map. For more information, visit the site or send request to contacts. The above data comes from the global database of United Kingdom which was updated on April 1st, 2024